Most of Sierra Leone's energy demand is not met. Generation has been separated from transmission and distribution, and private partners are invited to build and meter.

The gap

15% of the population has access to electricity
100 MW to 350 MW installed capacity, the Government's target by 2023
about 2,500 mm of rainfall a year, which supports hydropower
about 1,460 kWh/m² of solar radiation a year

The opportunity

Demand will keep rising as the country industrialises, as large mining projects open, and as Sierra Leone joins the West Africa Power Pool. Power generation has been unbundled from transmission and distribution, so private companies can take part in generation and metering. Independent power producers can sell to the Electricity Distribution and Supply Authority for commercial and household use.

The Government also promotes energy investment at company level. Mining companies, for example, are encouraged to work with private investors to meet their own power needs. The Renewable Energy Association of Sierra Leone helps to bring these investments about.

Where to invest

Solar

Sierra Leone receives about 1,460 kWh per square metre each year. There is room for grid-connected generation and for mini-grids.

Wind

Wind farms are possible on the coast, offshore and in hilly areas. Low-wind-speed turbines make rural electrification feasible, especially in the north.

Hydropower

With about 2,500 mm of rain a year, hydropower is a key source. The Government is promoting feasibility studies for about six hydropower projects.

Bioenergy

Biomass is already the country's largest energy source. Crops such as maize and cassava could make biofuels, and waste could yield biogas and methane.

Transmission and distribution

The long-term plan includes extending the rural grid, off-grid supply and distributed generation for settlements that have no power.

Why Sierra Leone

Strong demand

Global renewable capacity grew 45% in 2020, led by a 90% rise in wind. Sierra Leone's new energy strategy supports growing demand.

Better infrastructure

Power links with Côte d'Ivoire, Liberia and Guinea are complete, which opens the West Africa Power Pool. The road network is about 11,000 km, Freetown has the main port, and Lungi has a new airport.

Workforce

The labour force is forecast at 3 million by 2024. NIB reports that labour for jobs such as wind turbine technicians and engineers is 50% to 70% cheaper than in comparable African countries.

Stable climate

Sierra Leone is one of Africa's most peaceful countries, 46th of 163 in the Global Peace Index.

Figures are taken from NIB's sector report and its sources, which date mostly from 2019 to 2021. The full report gives each source and year.

Reports

The energy sector has its own tax and duty incentives.Investor incentives